GoBackload Listings archive
Welcome to the Freight Listings Archive, your go-to resource for exploring past freight shipments! Here, you can browse through a comprehensive collection of old listings, complete with detailed information about pricing, shipment destinations, and cargo details. This archive is an invaluable tool for understanding market trends and estimating the kind of pricing you can expect for your own shipments. Whether you're planning logistics, comparing costs, or analyzing routes, our archive provides the insights you need to make informed decisions with confidence.
Auckland Porirua (582km)
NSP 2100mm Hydraulic Tilting Excavator Bucket
1.1 x 2.1 x 1m
(2.3m3 LxWxH)
1300kg
6 Nov to 18 Nov
Auto-accept
$500
Completed
Auckland
6 Nov to 18 Nov
Porirua
582km
$500
Completed
Te Kūiti
6 Nov to 13 Nov
Nelson
648km
Completed
Auckland Waitōtara (451km)
Doosan DX140 LCR tracked excavator (2021) (relisted)
7.5 x 2.5 x 3m
(56.3m3 LxWxH)
14000kg
Auckland
6 Nov to 13 Nov
Waitōtara
451km
Completed
Auckland Waitōtara (451km)
Doosan DX140 LCR tracked excavator (2021)
7.5 x 2.5 x 3m
(56.3m3 LxWxH)
14000kg
Auckland
6 Nov to 13 Nov
Waitōtara
451km
Completed
Rolleston Silverdale (1125km)
Holden Colorado
5.85 x 1.8 x 1.7m
(17.9m3 LxWxH)
2200kg
Rolleston
6 Nov to 20 Nov
Silverdale
1125km
1 quote
Completed
Masterton Auckland (592km)
1 bedroom household part-load:
Masterton
5 Nov to 4 Dec
Auckland
592km
2 quotes
Completed
Alexandra Tauranga (1387km)
Alexandra
1 Dec to 21 Dec
Tauranga
1387km
4 quotes
Completed
Mount Maunganui Auckland (246km)
RX7 engine — Mount Maunganui to Whenuapai (relisted)
0.2 x 0.4 x 0.3m
(0.0m3 LxWxH)
Mount Maunganui
5 Nov to 12 Nov
Auckland
246km
1 quote
Completed
Mount Maunganui Auckland (229km)
Mount Maunganui
6 Nov to 7 Nov
Auckland
229km
Completed
Drury Napier (377km)
10 x Empty intermediate bulk containers (IBCs)
Drury
5 Nov to 12 Nov
Napier
377km
2 quotes
Completed
Kaitaia
5 Nov to 12 Nov
Auckland
327km
1 quote
Completed
Napier
14 Nov to 30 Nov
Auckland
424km
$640
3 quotes
Completed
Auckland Otago Region (1425km)
Auckland
3 Nov to 10 Nov
Otago Region
1425km
Completed
Auckland Christchurch (1087km)
Swim Spa [New on a pallet]
6 x 2.25 x 1.5m
(20.3m3 LxWxH)
1200kg
Auckland
10 Nov to 15 Dec
Christchurch
1087km
1 quote
Completed
Auckland Whakatāne (322km)
Dough Proofer- Commercial
0.5 x 0.5 x 1.2m
(0.3m3 LxWxH)
25kg
Auckland
3 Nov to 4 Dec
Whakatāne
322km
2 quotes
Completed
Auckland Upper Hutt (668km)
Wood chipper
2.15 x 0.85 x 1.75m
(3.2m3 LxWxH)
350kg
Auckland
3 Nov to 30 Nov
Upper Hutt
668km
1 quote
Completed
Moerewa Hāwera (631km)
Rideon mower
19 Nov to 22 Nov
1 quote
Auto-accept
$500
Completed
Moerewa
19 Nov to 22 Nov
Hāwera
631km
$500
1 quote
Completed
bullsheit service - never made contact, did not pick up at any time, ended up loading on trailer and driving down myself (5.0)
Ohakea Gisborne (417km)
Brent Smith tandem trailer
5 x 2.2 x 1.8m
(19.8m3 LxWxH)
1500kg
Ohakea
3 Nov to 10 Nov
Gisborne
417km
Completed
Lower Hutt Feilding (150km)
1 x 3 seater couch and 1 dining table (packed flat in box) and 2 dining chairs
8 Nov to 30 Nov
1 quote
Auto-accept
$100
Completed
Lower Hutt
8 Nov to 30 Nov
Feilding
150km
$100
1 quote
Completed
Kaiwaka Christchurch (1164km)
1x Pallet with V8 engine strapped on it (relisted)
1 x 1 x 1m
(1.0m3 LxWxH)
400kg
Kaiwaka
3 Nov to 10 Nov
Christchurch
1164km
Completed
Auckland Lower Hutt (635km)
King bed (mattress + base) — Auckland to Lower Hutt
1.96 x 1.1 x 0.62m
(1.3m3 LxWxH)
55kg
Auckland
3 Nov to 10 Nov
Lower Hutt
635km
$244
2 quotes
Completed
great service - really easy to use (5.0)
Kaiwaka Christchurch (1164km)
1x Pallet with V8 engine strapped on it
1 x 1 x 1m
(1.0m3 LxWxH)
400kg
Kaiwaka
3 Nov to 30 Nov
Christchurch
1164km
Completed
Lake Hayes Estate Auckland (1530km)
Site-safe toolbox (500 kg)
2 x 1.2 x 1m
(2.4m3 LxWxH)
500kg
Lake Hayes Estate
3 Nov to 10 Nov
Auckland
1530km
1 quote
Completed
Taupō Ōpunake (349km)
3.5 meter hay mower
3.5 x 2.3 x 1.2m
(9.7m3 LxWxH)
900kg
Taupō
3 Nov to 10 Nov
Ōpunake
349km
Completed
Auckland Queenstown (1559km)
2017 Nissan Leaf (drivable)
Auckland
3 Nov to 10 Nov
Queenstown
1559km
Completed
Orewa Meremere (99km)
3.5t excavator (Orewa → Meremere)
3500kg
Orewa
3 Nov to 10 Nov
Meremere
99km
2 quotes
Completed
Matakana Ōpōtiki (420km)
Tilt Hitch for a 20 ton excavator
0.6 x 0.6 x 0.6m
(0.2m3 LxWxH)
600kg
Matakana
2 Nov to 23 Nov
Ōpōtiki
420km
3 quotes
Completed
Wellington Kihikihi (482km)
Wellington
11 Nov to 25 Nov
Kihikihi
482km
3 quotes
Completed
Auckland Kingston (1594km)
2017 Nissan Leaf - Drivable
Auckland
15 Dec to 31 Jan
Kingston
1594km
Completed
Taupō Ōpunake (357km)
Transport 3.5m hay mower Taupō → Ōpunake
3.5 x 2.3 x 1.2m
(9.7m3 LxWxH)
900kg
Taupō
2 Nov to 6 Nov
Ōpunake
357km
Completed
Auckland Dunedin (1424km)
king mattress only
2.03 x 1.83 x 0.03m
(0.1m3 LxWxH)
35kg
Auckland
2 Nov to 16 Nov
Dunedin
1424km
1 quote
Completed
Rangiora Invercargill (587km)
Rangiora
1 Nov to 8 Nov
Invercargill
587km
1 quote
Completed
Swannanoa Hanmer Springs (125km)
FTL- 60+ Large Squares of Hay
2.4 x 0.9 x 0.9m
(1.9m3 LxWxH)
450kg
Swannanoa
28 Dec to 10 Jan
Hanmer Springs
125km
1 quote
Completed
Canterbury Region Hanmer Springs (125km)
60 plus medium squares
2.4 x 0.9 x 0.9m
(1.9m3 LxWxH)
450kg
Canterbury Region
15 Dec to 10 Jan
Hanmer Springs
125km
1 quote
Completed
Maungaturoto Culverden (1105km)
HD25T Tractor trailer
6.8 x 2.6 x 2.6m
(46.0m3 LxWxH)
7000kg
31 Oct to 7 Nov
Auto-accept
$3000
Completed
Maungaturoto
31 Oct to 7 Nov
Culverden
1105km
$3000
Completed
Auckland
31 Oct to 31 Mar
Nelson
845km
1 quote
Completed
Lower Hutt Auckland (640km)
Lower Hutt
31 Oct to 7 Nov
Auckland
640km
1 quote
Completed
Dunedin Auckland (1418km)
Mattress Transport - Dunedin to Auckland
2 x 1.5 x 0.3m
(0.9m3 LxWxH)
20kg
Dunedin
6 Nov to 30 Nov
Auckland
1418km
$200
1 quote
Completed
Auckland New Plymouth (360km)
4 pallets of 5.4m Decking
5.4 x 0.54 x 0.46m
(1.3m3 LxWxH)
1.44kg
Auckland
30 Oct to 6 Nov
New Plymouth
360km
Completed
Balclutha Christchurch (440km)
Generator - Urgent
5 x 2 x 1.7m
(17.0m3 LxWxH)
800kg
Balclutha
29 Oct to 5 Nov
Christchurch
440km
1 quote
Completed
Timaru Duntroon (102km)
Large Spa Pool - Hexagon Shape - 2420mm x 900mm
500kg
Timaru
29 Oct to 12 Nov
Duntroon
102km
Completed
Edendale Hamilton (1474km)
EZGO Golf Cart
2.4 x 1.2 x 1.8m
(5.2m3 LxWxH)
600kg
Edendale
29 Oct to 5 Nov
Hamilton
1474km
4 quotes
Completed
Awakeri Gisborne (195km)
Chiller panels and refrigeration equipment
Awakeri
29 Oct to 15 Nov
Gisborne
195km
Completed
Dunedin Waiuku (1408km)
Scissor Lift - non running
1.6 x 0.8 x 2m
(2.6m3 LxWxH)
1554kg
Dunedin
29 Oct to 5 Nov
Waiuku
1408km
2 quotes
Completed
Auckland Christchurch (1081km)
Shower liner, frame and tray
10 x 1.1 x 20m
(220.0m3 LxWxH)
30kg
Auckland
29 Oct to 5 Nov
Christchurch
1081km
Completed
Coopers Beach Auckland (309km)
Truck Deck and Cab
8.3 x 2.8 x 2.9m
(67.4m3 LxWxH)
7500kg
Coopers Beach
28 Oct to 11 Nov
Auckland
309km
Completed
Cable Bay Auckland (312km)
Cable Bay
28 Oct to 1 Dec
Auckland
312km
Completed
Auckland Ōhau (534km)
1 ton roller (relisted)
2.5 x 1.5 x 1.2m
(4.5m3 LxWxH)
1000kg
Auckland
28 Oct to 11 Nov
Ōhau
534km
1 quote
Completed
Auckland Ōhau (534km)
1 ton roller
2.5 x 1.5 x 1.2m
(4.5m3 LxWxH)
1000kg
Auckland
28 Oct to 4 Nov
Ōhau
534km
1 quote
Completed
Blenheim Whangārei (916km)
Shop Shelving Transport
3.5 x 2.2 x 2.33m
(17.9m3 LxWxH)
3000kg
Blenheim
28 Oct to 4 Nov
Whangārei
916km
Completed
Gore Cambridge (1434km)
John deere 6170 m
5 x 2.3 x 3.1m
(35.6m3 LxWxH)
7kg
Gore
28 Oct to 18 Nov
Cambridge
1434km
3 quotes
Completed
Gore Cambridge (1434km)
John deere 6170 m
5 x 2.3 x 3.1m
(35.6m3 LxWxH)
7kg
Gore
28 Oct to 18 Nov
Cambridge
1434km
1 quote
Completed
Hamilton Auckland (154km)
Hamilton
28 Oct to 4 Nov
Auckland
154km
$450
1 quote
Completed
Auckland
28 Oct to 6 Nov
Nelson
846km
Completed
Christchurch Hunterville (613km)
1/4 Drum of mains cable
1 x 1 x 1m
(1.0m3 LxWxH)
50kg
28 Oct to 3 Nov
Auto-accept
$200
Completed
Christchurch
28 Oct to 3 Nov
Hunterville
613km
$200
Completed
Christchurch Whangārei (1235km)
Car suspension crossmember
1.4 x 0.4 x 0.4m
(0.2m3 LxWxH)
30kg
Christchurch
26 Oct to 2 Nov
Whangārei
1235km
Completed
Picton (Bluebridge Cook Strait Ferry) - Wellington Wellington (51km)
Freight for Can-am Quad Bike
2.1 x 1.2 x 1.2m
(3.0m3 LxWxH)
400kg
Picton (Bluebridge Cook Strait Ferry) - Wellington
26 Oct to 2 Nov
Wellington
51km
$150
1 quote
Completed
Timaru Tikokino (842km)
32 x Bags of fert
32000kg
Timaru
25 Oct to 1 Mar
Tikokino
842km
4 quotes
Completed
Manawatu-Wanganui Otago Region (978km)
Manawatu-Wanganui
28 Oct to 28 Nov
Otago Region
978km
Completed
Blenheim Auckland (762km)
Chiller Unit
2.5 x 2.3 x 2.2m
(12.7m3 LxWxH)
200kg
Blenheim
24 Oct to 7 Nov
Auckland
762km
2 quotes
Completed
Kokatahi Glenbrook (1126km)
International 574 Tractor with roll bar and a front end loader attachment
2.5 x 2 x 2m
(10.0m3 LxWxH)
1000kg
Kokatahi
24 Oct to 31 Jan
Glenbrook
1126km
Completed
Haumoana Ōakura (419km)
20-foot container (household items)
6.06 x 2.44 x 2.59m
(38.3m3 LxWxH)
2500kg
Haumoana
18 Nov to 31 Dec
Ōakura
419km
Completed
Christchurch Auckland (1062km)
Transmission (B2B)
0.7 x 0.8 x 0.5m
(0.3m3 LxWxH)
80kg
Christchurch
24 Oct to 31 Oct
Auckland
1062km
1 quote
Completed
Hamilton Mangamuka (392km)
21T Hyundai Digger
6 x 3 x 3m
(54.0m3 LxWxH)
21000kg
Hamilton
24 Oct to 31 Oct
Mangamuka
392km
Completed
Waikato Region Mangamuka (380km)
Jako SK180
6 x 2.7 x 2.8m
(45.4m3 LxWxH)
5000kg
Waikato Region
24 Oct to 31 Oct
Mangamuka
380km
1 quote
Completed
Papamoa Kaikohe (470km)
Kubota Tractor Te Puke to Kaikohe
5 x 2.6 x 2.5m
(32.5m3 LxWxH)
2.9kg
Papamoa
24 Oct to 31 Oct
Kaikohe
470km
2 quotes
Completed
Christchurch Auckland (1062km)
Transmission (relisted)
0.7 x 0.8 x 0.5m
(0.3m3 LxWxH)
80kg
Christchurch
23 Oct to 30 Oct
Auckland
1062km
1 quote
Completed
Christchurch Auckland (1062km)
Transmission (relisted)
0.7 x 0.8 x 0.5m
(0.3m3 LxWxH)
80kg
Christchurch
23 Oct to 13 Nov
Auckland
1062km
Completed
Kaikohe Queenstown (1777km)
24T Volvo Log Grapple
8 x 3.1 x 3.93m
(97.5m3 LxWxH)
24000kg
Kaikohe
23 Oct to 30 Oct
Queenstown
1777km
3 quotes
Completed
Kereru Galatea (287km)
8 ton digger and buckets (relisted)
6.5 x 2.4 x 2.5m
(39.0m3 LxWxH)
8800kg
Kereru
23 Oct to 30 Oct
Galatea
287km
1 quote
Completed
Kereru Galatea (287km)
8 ton digger and buckets
8.2kg
Kereru
23 Oct to 30 Oct
Galatea
287km
1 quote
Completed
Warkworth Kaitaia (254km)
21T Digger Warkworth to Kaitaia
9.5 x 3 x 3m
(85.5m3 LxWxH)
22000kg
Warkworth
23 Oct to 30 Oct
Kaitaia
254km
2 quotes
Completed
Waipatu Whakatāne (324km)
Waipatu
23 Oct to 30 Oct
Whakatāne
324km
Completed
Ashburton Auckland (1141km)
2 pallets of cleaning products
1 x 1 x 1m
(1.0m3 LxWxH)
500kg
Ashburton
22 Oct to 29 Oct
Auckland
1141km
1 quote
Completed
Dunedin Christchurch (383km)
Dunedin
22 Oct to 29 Oct
Christchurch
383km
2 quotes
Completed
Te Karaka Hamilton (347km)
Tractor (Gisborne to Hamilton)
4.5 x 2.2 x 2.4m
(23.8m3 LxWxH)
3600kg
Te Karaka
22 Oct to 29 Oct
Hamilton
347km
Completed
Cromwell Invercargill (231km)
Oven
1.2 x 0.6 x 0.9m
(0.6m3 LxWxH)
80kg
Cromwell
22 Oct to 2 Nov
Invercargill
231km
1 quote
Completed
Te Karaka Hamilton (347km)
Tractor
4.5 x 2.2 x 2.4m
(23.8m3 LxWxH)
3600kg
Te Karaka
22 Oct to 31 Oct
Hamilton
347km
1 quote
Completed
Christchurch Dunedin (360km)
Christchurch
23 Oct to 31 Oct
Dunedin
360km
1 quote
Completed
Ngatea
21 Oct to 30 Nov
Papamoa
122km
2 quotes
Completed
Whangārei Nelson (1002km)
Whangārei
23 Oct to 28 Oct
Nelson
1002km
1 quote
Completed
Marton Auckland (494km)
13 Pkts of Timber
4.2 x 1 x 1m
(4.2m3 LxWxH)
Marton
3 Nov to 30 Nov
Auckland
494km
3 quotes
Completed
Marton Auckland (494km)
13 Pkts of Timber (relisted)
4.2 x 1 x 1m
(4.2m3 LxWxH)
Marton
3 Nov to 30 Nov
Auckland
494km
1 quote
Completed
Auckland Wellington (652km)
Arcade Games - Auckland to Wellington
1.2 x 0.85 x 2.15m
(2.2m3 LxWxH)
100kg
Auckland
21 Oct to 28 Oct
Wellington
652km
2 quotes
Completed
Auckland Wellington (652km)
Arcade Games - Auckland to Wellington
1.2 x 0.85 x 2.15m
(2.2m3 LxWxH)
100kg
Auckland
23 Oct to 31 Oct
Wellington
652km
1 quote
Completed
Wellington Auckland (641km)
1 bedroom, Wellington to Auckland
Wellington
18 Nov to 21 Nov
Auckland
641km
3 quotes
Completed
Wellington
21 Oct to 28 Oct
Clyde
875km
1 quote
Completed
Wellington Christchurch (437km)
Wellington
21 Oct to 28 Oct
Christchurch
437km
1 quote
Completed
Tauranga Christchurch (951km)
Tauranga
21 Oct to 28 Oct
Christchurch
951km
Completed
Mount Maunganui Queenstown (1428km)
3.5m IRB boat and trailer
3.9 x 1.8 x 1.5m
(10.5m3 LxWxH)
100kg
Mount Maunganui
21 Oct to 1 Dec
Queenstown
1428km
1 quote
Completed
Christchurch Auckland (1079km)
Rangehood
0.5 x 0.9 x 0.64m
(0.3m3 LxWxH)
14kg
Christchurch
23 Oct to 25 Oct
Auckland
1079km
Completed
Pōkeno Paraparaumu (537km)
Sheet Metal Shrinker Stretcher Transport
1.15 x 0.5 x 0.4m
(0.2m3 LxWxH)
25kg
20 Oct to 31 Oct
2 quotes
Auto-accept
$100
Completed
Pōkeno
20 Oct to 31 Oct
Paraparaumu
537km
$100
2 quotes
Completed
Auckland Ohauiti (217km)
3 portacoms (4m x 2.5m)
4 x 2.5 x 2.3m
(23.0m3 LxWxH)
800kg
Auckland
20 Oct to 25 Oct
Ohauiti
217km
3 quotes
Completed
Auckland Gisborne (466km)
Load to Gisbone
20 Oct to 27 Oct
Auto-accept
$400
Completed
Auckland
20 Oct to 27 Oct
Gisborne
466km
$400
Completed
Otago Region Tauranga (1291km)
Chest of Drawers
0.4 x 0.8 x 1.15m
(0.4m3 LxWxH)
Otago Region
24 Oct to 3 Nov
Tauranga
1291km
$114
1 quote
Completed
Auckland Christchurch (1069km)
Roof box
2.05 x 0.8 x 0.3m
(0.5m3 LxWxH)
19kg
Auckland
26 Oct to 14 Nov
Christchurch
1069km
2 quotes
Completed
Auckland Christchurch (1069km)
Auckland
19 Oct to 14 Nov
Christchurch
1069km
Completed
Franz Josef / Waiau Rangiora (374km)
2 x 2 Seater Couches
2.2 x 1.2 x 1.2m
(3.2m3 LxWxH)
50kg
Franz Josef / Waiau
19 Oct to 19 Dec
Rangiora
374km
Completed
Palmerston Runanga (503km)
Palmerston
1 Nov to 30 Nov
Runanga
503km
Completed
Te Awamutu Ōhau (401km)
Walker ride on mower (relisted)
1.5 x 1 x 1.2m
(1.8m3 LxWxH)
300kg
19 Oct to 26 Oct
3 quotes
Auto-accept
$250
Completed
Te Awamutu
19 Oct to 26 Oct
Ōhau
401km
$250
3 quotes
Completed
PreviousNext page